Monday, October 29, 2007
Expanded team for 2007
This year Steve Harvey joins Dave and Vic to help with the stage set for this year's production. He is lending his considerable engineering skills to assist in building what will be the most ambitious stage set for any show to date with a 20 ft long multi-level raised platform covering the whole of the stage behind mid-tabs.
Subscribe to:
Posts (Atom)